Whether you’re constructing a new deck or upgrading an existing structure, it’s essential to ensure compliance with all local building codes and permit requirements. This webpage is designed to provide you with a clear and concise list of necessary permits, drawings, and site requirements to help you navigate the process smoothly and efficiently.
Locates must be done prior to starting your project. For any construction project that involves building near property lines, it is essential to apply for locates. Locates help ensure that you are aware of and can avoid any underground utilities or structures that may be present, ensuring safety and compliance with local regulations.
Use the table of contents below to see the requirements for your zone.
Table of contents
Decks 24 Inches and Under
The following requirements apply to decks that are 24 inches and under in height and are not covered. If the deck is covered the requirements for Decks over 24 Inches will apply.
Residential General (R) & Multi-Family Zones (R3)
Permits Required
- Building Permit/Development Permit
- Drainage Permit is required if you are changing the grades
Drawings Required
- Site Plan (see Frequently Asked Questions page for requirements),
- Construction Drawings
- Cross Sections
- Foundation Plans
- Engineered Drawings (if applicable)
- Engineered Drainage Plan (if applicable)
- Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of the application)
Site Requirements
Minimum Standards | |
Front Yard |
20 feet from property line |
Rear Yard |
1 foot from property line |
Interior Side Yard |
1 foot from property line |
Corner Side Yard |
10 feet from property line |
Residential Small Lot Zones (RS)
Permits Required
- Building Permit/Development Permit
- Drainage Permit is required if you are changing the grades
Drawings Required
- Site Plan (see Frequently Asked Questions page for requirements)
- Construction Drawings
- Cross Sections
- Foundation Plans
- Engineered Drawings (if applicable)
- Engineered Drainage Plan (if applicable)
- Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of the application)
Site Requirements
Minimum Standards | |
Front Yard |
20 feet from property line |
Rear Yard |
1 foot from property line |
Interior Side Yard |
1 foot from property line |
Corner Side Yard |
10 feet from property line |
Comprehensive Residential (RC)
Permits Required
- Building Permit/Development Permit
- Drainage Permit is required if you are changing the grades
Drawings Required
- Site Plan (see Frequently Asked Questions page for requirements)
- Construction Drawings
- Cross Sections
- Foundation Plans
- Engineered Drawings (if applicable)
- Engineered Drainage Plan (if applicable)
- Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of the application)
Site Requirements
Minimum Standards | |
Front Yard |
20 feet from property line |
Rear Yard | 2 foot from property line |
Interior Side Yard | 2 foot from property line |
Corner Side Yard |
10 feet from property line |
Rural Residential (RR)
Permits Required
- Building Permit/Development Permit
- Drainage Permit is required if you are changing the grades
Drawings Required
- Site Plan (see Frequently Asked Questions page for requirements)
- Construction Drawings
- Cross Sections
- Foundation Plans
- Engineered Drawings (if applicable)
- Engineered Drainage Plan (if applicable)
- Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of the application)
Site Requirements
Minimum Standards | |
Front Yard |
20 feet from property line |
Rear Yard |
1 foot from property line |
Interior Side Yard |
1 foot from property line |
Corner Side Yard |
10 feet from property line |
Decks over 24 Inches
The following requirements apply to any decks that are higher than 24 inches. Additionally, if a deck has a covering these requirements also apply.
Residential General (R) & Multi-Family Zones (R3)
Permits Required
- Building Permit/Development Permit
- Drainage Permit is required if you are changing the grades
Drawings Required
- Site Plan (see Frequently Asked Questions page for requirements)
- Construction Drawings
- Cross Sections
- Foundation Plans
- Engineered Drawings (if applicable)
- Engineered Drainage Plan (if applicable)
- Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of the application)
Site Requirements
Minimum Standards | |
Front Yard |
20 feet from property line |
Rear Yard |
25 feet from property line |
Interior Side Yard |
5 feet from property line |
Corner Side Yard |
10 feet from property line |
Residential Small Lot Zones (RS)
Permits Required
- A building permit is required
- A drainage permit is required if you are changing the grades
Drawings Required
- Site Plan (see Frequently Asked Questions page for requirements)
- Construction Drawings
- Cross Sections
- Foundation Plans
- Engineered Drawings (if applicable)
- Engineered Drainage Plan (if applicable)
- Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of the application)
Site Requirements
Minimum Standards | |
Front Yard |
20 feet from property line |
Rear Yard |
25 feet from property line |
Interior Side Yard |
4 feet from property line |
Corner Side Yard |
5 feet from property line |
Comprehensive Residential (RC)
Permits Required
- Building Permit/Development Permit
- Drainage Permit is required if you are changing the grades
Drawings Required
- Site Plan (see Frequently Asked Questions page for requirements)
- Construction Drawings
- Cross Sections
- Foundation Plans
- Engineered Drawings (if applicable)
- Engineered Drainage Plan (if applicable)
- Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of the application)
Site Requirements
Minimum Standards | |
Front Yard |
20 feet from property line |
Rear Yard |
1 feet from property line |
Interior Side Yard |
1 feet from property line |
Corner Side Yard |
10 feet from property line |
Rural Residential (RR)
Permits Required
- Building Permit/Development Permit
- Drainage Permit is required if you are changing the grades
Drawings Required
- Site Plan (see Frequently Asked Questions page for requirements)
- Construction Drawings
- Cross Sections
- Foundation Plans
- Engineered Drawings (if applicable)
- Engineered Drainage Plan (if applicable)
- Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of the application)
Site Requirements
Minimum Standards | |
Front Yard |
100 feet from property line |
Rear Yard |
25 feet from property line |
Interior Side Yard |
15 feet from property line |
Corner Side Yard |
25 feet from property line |
Zoning By-Law Section 6: Residential
Application Fees
Application Form
Frequently Asked Questions