These are buildings that include office buildings, retail space, warehouses and more. This differs somewhat from commercial property, which also includes multi-family buildings like apartment buildings (multi-family buildings above). 

CENTRAL COMMERCIAL (C2)

Permits Required

  • Building Permit/Development Permit
  • Plumbing Permit
  • Drainage Permit
  • Demo Permit (if there is an existing structure),
  • Approach Permit
  • Water and Wastewater Connection Permit
  • Electrical Permit (this is not a city permit, you must go to Manitoba Hydro)

Locates must be done prior to starting your project

Drawings Required

  • Site Plan (see Frequently Asked Questions page for requirements),
  • Construction Drawings
    • Floor Plan (if you’re pouring a basement but not finishing it, we still need a drawing showing where the windows are going to be located along with any bathrooms must be labelled)
    • Cross Sections
    • Window Schedule
    • Foundation Plans
    • Engineered Drawings (if applicable)
    • Plumbing Schematics 
    • Red Seal ticket for Plumber
  • Engineered Drainage Plan (if applicable)
  • Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of application) 

Site Requirements

  Minimum Standards
Front Yard 0 feet from property line (finished exterior)
Rear Yard 2 feet from property line (finished exterior)
Interior Side Yard 0 feet from property line (finished exterior)
Corner Side Yard 0 feet from property line (finished exterior)
Height* 75 feet
Maximum Coverage 100% of lot

*see definition of height in the Zoning By-Law

STRIP COMMERCIAL (C3)

Permits Required

  • Building Permit/Development Permit
  • Plumbing Permit
  • Drainage Permit
  • Demo Permit (if there is an existing structure),
  • Approach Permit
  • Water and Wastewater Connection Permit
  • Electrical Permit (this is not a city permit, you must go to Manitoba Hydro)

Locates must be done prior to starting your project

Drawings Required

  • Site Plan (see Frequently Asked Questions page for requirements),
  • Construction Drawings
    • Floor Plan (if you’re pouring a basement but not finishing it, we still need a drawing showing where the windows are going to be located along with any bathrooms must be labelled)
    • Cross Sections
    • Window Schedule
    • Foundation Plans
    • Engineered Drawings (if applicable)
    • Plumbing Schematics 
    • Red Seal ticket for Plumber
  • Engineered Drainage Plan (if applicable)
  • Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of the application).

Site Requirements

  Minimum Standards
Front Yard 40 feet from property line (finished exterior)
Rear Yard 10 feet from property line (finished exterior)
Interior Side Yard 0 feet from property line (finished exterior)
Corner Side Yard 0 feet from property line (finished exterior)
Height* 30 feet
Maximum Coverage 60% of lot

*see definition of height in the Zoning By-Law

HIGHWAY COMMERCIAL (C4)

Permits Required

  • Building Permit/Development Permit
  • Plumbing Permit
  • Drainage Permit
  • Demo Permit (if there is an existing structure),
  • Approach Permit
  • Water and Wastewater Connection Permit
  • Electrical Permit (this is not a city permit, you must go to Manitoba Hydro)

Locates must be done prior to starting your project

Drawings Required

  • Site Plan (see Frequently Asked Questions page for requirements)
  • Construction Drawings
    • Floor Plan (if you’re pouring a basement but not finishing it, we still need a drawing showing where the windows are going to be located along with any bathrooms must be labelled)
    • Cross Sections
    • Window Schedule
    • Foundation Plans
    • Engineered Drawings (if applicable)
    • Plumbing Schematics 
    • Red Seal ticket for Plumber
  • Engineered Drainage Plan (if applicable)
  • Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of the application). 

Site Requirements

  Minimum Standards
Front Yard 50 feet from property line (finished exterior)
Rear Yard 25 feet from property line (finished exterior)
Interior Side Yard 15 feet from property line (finished exterior)
Corner Side Yard 20 feet from property line (finished exterior)
Height* 30 feet
Maximum Coverage 50% of lot

*see definition of height in the Zoning By-Law

LIGHT INDUSTRIAL (M1)

Permits Required

  • Building Permit/Development Permit
  • Plumbing Permit
  • Drainage Permit
  • Demo Permit (if there is an existing structure),
  • Approach Permit
  • Water and Wastewater Connection Permit
  • Electrical Permit (this is not a city permit, you must go to Manitoba Hydro)

Locates must be done prior to starting your project

Drawings Required

  • Site Plan (see Frequently Asked Questions page for requirements)
  • Construction Drawings
    • Floor Plan (if you’re pouring a basement but not finishing it, we still need a drawing showing where the windows are going to be located along with any bathrooms must be labelled)
    • Cross Sections
    • Window Schedule
    • Foundation Plans
    • Engineered Drawings (if applicable)
    • Plumbing Schematics 
    • Red Seal ticket for Plumber
  • Engineered Drainage Plan (if applicable)
  • Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of the application)

Site Requirements

  Minimum Standards
Front Yard 25 feet from property line (finished exterior)
Rear Yard 10 feet from property line (finished exterior)
Interior Side Yard 5 feet from property line (finished exterior)
Corner Side Yard 10 feet from property line (finished exterior)
Height* 45 feet
Maximum Coverage 60% of lot

*see definition of height in the Zoning By-Law

HEAVY INDUSTRIAL (M2)

Permits Required

  • Building Permit/Development Permit
  • Plumbing Permit
  • Drainage Permit
  • Demo Permit (if there is an existing structure),
  • Approach Permit
  • Water and Wastewater Connection Permit
  • Electrical Permit (this is not a city permit, you must go to Manitoba Hydro)

Locates must be done prior to starting your project

Drawings Required

  • Site Plan (see Frequently Asked Questions page for requirements),
  • Construction Drawings
    • Floor Plan (if you’re pouring a basement but not finishing it, we still need a drawing showing where the windows are going to be located along with any bathrooms must be labelled)
    • Cross Sections
    • Window Schedule
    • Foundation Plans
    • Engineered Drawings (if applicable)
    • Plumbing Schematics 
    • Red Seal ticket for Plumber
  • Engineered Drainage Plan (if applicable)
  • Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of the application)

Site Requirements

  Minimum Standards
Front Yard 25 feet from property line (finished exterior)
Rear Yard 10 feet from property line (finished exterior)
Interior Side Yard 10 feet from property line (finished exterior)
Corner Side Yard 15 feet from property line (finished exterior)
Height* n/a
Maximum Coverage 60% of lot

*see definition of height in the Zoning By-Law

BUSINESS PARK ZONE (MP)

Drawings Required

  • Building Permit/Development Permit
  • Plumbing Permit
  • Drainage Permit
  • Demo Permit (if there is an existing structure),
  • Approach Permit
  • Water and Wastewater Connection Permit
  • Electrical Permit (this is not a city permit, you must go to Manitoba Hydro)

Locates must be done prior to starting your project

Drawings Required

  • Site Plan (see Frequently Asked Questions page for requirements),
  • Construction Drawings
    • Floor Plan (if you’re pouring a basement but not finishing it, we still need a drawing showing where the windows are going to be located along with any bathrooms must be labelled)
    • Cross Sections
    • Window Schedule
    • Foundation Plans
    • Engineered Drawings (if applicable)
    • Plumbing Schematics
    • Red Seal ticket for Plumber
  • Engineered Drainage Plan (if applicable)
  • Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of the application)

Site Requirements

  Minimum Standards
Front Yard 30 feet from property line (finished exterior)
Rear Yard 25 feet from property line (finished exterior)
Interior Side Yard 10 feet from property line (finished exterior)
Corner Side Yard 15 feet from property line (finished exterior)
Height* 45 feet
Maximum Coverage 60% of lot