Asphalting on the 500 block of Manchester begins Tuesday September 3rd. Please be prepared for no access for a 24 hour period once paving begins.
Category: Infrastructure
Share this post
Asphalting on the 500 block of Manchester begins Tuesday September 3rd. Please be prepared for no access for a 24 hour period once paving begins.