Manchester Ave: Contractor will be onsite Wednesday, September 11, 2019 to pave the driveway approaches. This will likely take 2 days to complete. Residents will need to allow one overnight for asphalt to cool before the driveway can be used.
Category: Infrastructure
Share this post