Eveline Street Reconstruction: on the west side of Eveline, gravel base work is ongoing on the round about. Boulevard prep is ongoing between Dufferin and Superior with concrete pouring beginning today. Sidewalk pouring between Manitoba and Clandeboye begins today. Silva cell installation continues and is expected to be completed by the end of today.
Category: Infrastructure
Share this post