Eveline Street Reconstruction: framing on the interior of the round about is ongoing with curb pouring continuing tomorrow and Friday. Concrete sidewalk, curb framing and pouring tie-ins ongoing between Eaton and Manitoba. Boulevard prep continuing in preparation of paving stones being installed. Reminder for motorists and pedestrians – please travel through the construction site with caution as work is taking place over the entire project area.