Eveline Street Reconstruction: Ongoing concrete framing and pouring on the round about. Concrete boulevard base framing and pouring, in conjunction with tree box and bench box framing and pouring happening on the west side of Eveline between Eaton and Manitoba. Boulevard prep continues in preparation for paving stones between Manitoba to Morris. Work will continue on the project periodically on Saturdays through the remainder of the season. Once again, please proceed with caution through the construction zone.
Category: Infrastructure
Share this post