Sutherland Avenue Watermain Renewal: contractors are on Sutherland Avenue getting connections ready for the watermain renewal. There could be intermittent traffic disruptions next week but residents should still be able to use their driveways. There should be no disruption to garbage and recycling during this stage of the project.
Category: Infrastructure
Share this post