Sutherland Avenue Land Drainage Sewer Installation: starting Tuesday, August 8th, Sutherland Avenue between Main Street and Jemima Street will be closed to thru traffic with local access only. Contractors will be onsite installing a land drainage sewer pipe across the roadway. Residents will still have access to their driveways, but may have to enter the street either to the east or west of the road cut.
Category: Infrastructure
Share this post