Update August 29, 2019
Asphalting on the 500 block of Manchester begins Tuesday September 3rd. Please be prepared for no access for a 24 hour period once paving begins.
Asphalting on the 500 block of Manchester begins Tuesday September 3rd. Please be prepared for no access for a 24 hour period once paving begins.
Manchester Roadworks – ready for boulevard restoration, gravel prep nearing completion.
Manchester Ave: Concrete curb and gutter work begins today. There will be zero driveway access for 2 days. Manitoba Ave East: South side lighting and sidewalk work continues.
Manitoba Ave East: South side concrete approaches continue to be poured. South side lighting and sidewalk work begins. Manchester Ave Roadworks: Road excavation near completion. Sidewalks being framed and poured…
Manitoba Avenue East: South lane concrete curb and asphalt work completed. Active transportation lane work to begin soon. Superior Ave: No change. Manchester Ave: Delay in roadwork schedule. Contractor will…