Update: August 25, 2022
Eveline Street Reconstruction: excavation and base material placement work continues on the northbound lane between Eaton and Manitoba. Boulevard preparation and brickwork continues between Queen and Superior. Base work and…
Eveline Street Reconstruction: excavation and base material placement work continues on the northbound lane between Eaton and Manitoba. Boulevard preparation and brickwork continues between Queen and Superior. Base work and…
Eveline Street Reconstruction: the traffic control switch over for all north bound traffic began today from Eaton to Clandeboye and from Manitoba to Superior. The traffic will now travel northbound…
Eveline Street Reconstruction: Ongoing concrete framing and pouring on the round about. Concrete boulevard base framing and pouring, in conjunction with tree box and bench box framing and pouring happening…
Eveline Street Reconstruction: framing on the interior of the round about is ongoing with curb pouring continuing tomorrow and Friday. Concrete sidewalk, curb framing and pouring tie-ins ongoing between Eaton…
Eveline Street Reconstruction: gravel base work still being done on the round about on Eveline by Selkirk Park entrance. On the west side of the street between Clandeboye and Eaton,…