Detached/Single-Family Dwelling Is a (home, house, or dwelling) is a building that does not share wall with other houses. The building is usually occupied by just one household or family, and consists of just one dwelling unit or suite. In some jurisdictions allowances are made for basement suites or mother-in-law suites without changing the description from “single family”. It does exclude, however, any short-term accommodation (hotel, motels, inns), large-scale rental accommodation (rooming or boarding houses, apartments).
For more information on the permits and/or drawings required please click in the applicable zone for your project.
Zones
RESIDENTIAL GENERAL (R) & MULTI-FAMILY ZONES (R3)
Permits Required
-
- Drainage Permit
-
- Demo Permit (if there is an existing structure),
-
- Street Cut Permit (if applicable)
-
- Electrical Permit (this is not a city permit, you must go to Manitoba Hydro)
Locates must be done prior to starting your project
Drawings Required
-
- Construction Drawings
-
- Floor Plan (if you’re pouring a basement but not finishing it, we still need a drawing showing where the windows are going to be located along with any bathrooms must be labelled)
-
- Cross Sections
-
- Window Schedule
-
- Foundation Plans
-
- Engineered Drawings (if applicable)
-
- Plumbing Schematics
-
- Red Seal ticket for Plumber
-
- Construction Drawings
-
- Engineered Drainage Plan (if applicable)
-
- Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of application).
Site Requirements
Minimum Standards | |
Front Yard | 20 feet from property line (finished exterior) |
Rear Yard | 25 feet from property line (finished exterior) |
Interior Side Yard | 5 feet from property line (finished exterior) |
Corner Side Yard | 10 feet from property line (finished exterior) |
Height* | 30 feet |
Maximum Coverage | 40% of lot |
Unit Area** | 800 square feet |
Building Separation | 8 feet from Principal Building |
Eaves: Side Yard | 1 foot from property line (finished exterior) (3.25.1.1) |
Eaves: Rear Yard | 1 foot from property line (finished exterior) (3.25.1.1) |
*see definition of height in the Zoning By-Law
**Unit Area is considered a minimum building area (footprint) on an individual lot
RESIDENTIAL SMALL LOT ZONES (RS)
Permits Required
-
- Plumbing Permit
-
- Drainage Permit
-
- Demo Permit (if there is an existing structure),
-
- Electrical Permit (this is not a city permit, you must go to Manitoba Hydro)
Locates must be done prior to starting your project
Drawings Required
-
- Construction Drawings
-
- Floor Plan (if you’re pouring a basement but not finishing it, we still need a drawing showing where the windows are going to be located along with any bathrooms must be labelled)
-
- Cross Sections
-
- Window Schedule
-
- Foundation Plans
-
- Engineered Drawings (if applicable)
-
- Plumbing Schematics
-
- Red Seal ticket for Plumber
-
- Construction Drawings
-
- Engineered Drainage Plan (if applicable)
-
- Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of application)
Site Requirements
Minimum Standards | |
Front Yard | 20 feet from property line (finished exterior) |
Rear Yard | 25 feet from property line (finished exterior) |
Interior Side Yard | 4 feet from property line (finished exterior) |
Corner Side Yard | 5 feet from property line (finished exterior) |
Height* | 30 feet |
Maximum Coverage | 40% of lot |
Unit Area** | 500 square feet |
Building Separation | 8 feet from Principal Building |
Eaves: Side Yard | 1 foot from property line (finished exterior) (3.25.1.1) |
Eaves: Rear Yard | 1 foot from property line (finished exterior) (3.25.1.1) |
*see definition of height in the Zoning By-Law
**Unit Area is considered a minimum building area (footprint) on an individual lot.
COMPREHENSIVE RESIDENTIAL (RC)
Permit Required
-
- Drainage Permit
-
- Demo Permit (if there is an existing structure),
-
- Electrical Permit (this is not a city permit, you must go to Manitoba Hydro)
Locates must be done prior to starting your project
Drawings Required
-
- Construction Drawings
-
- Floor Plan (if you’re pouring a basement but not finishing it, we still need a drawing showing where the windows are going to be located along with any bathrooms must be labelled)
-
- Cross Sections
-
- Window Schedule
-
- Foundation Plans
-
- Engineered Drawings (if applicable)
-
- Plumbing Schematics
-
- Red Seal ticket for Plumber
-
- Construction Drawings
-
- Engineered Drainage Plan (if applicable)
-
- Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of application)
Site Requirements
Minimum Standards | |
Front Yard | 20 feet from property line (finished exterior) |
Rear Yard | 25 feet from property line (finished exterior) |
Interior Side Yard | 5 feet from property line (finished exterior) |
Corner Side Yard | 10 feet from property line (finished exterior) |
Height* | 30 feet |
Maximum Coverage | 40% of lot |
Unit Area** | 800 square feet |
Building Separation | 8 feet from Principal Building |
Eaves: Side Yard | 1 foot from property line (finished exterior) (3.25.1.1) |
Eaves: Rear Yard | 1 foot from property line (finished exterior) (3.25.1.1) |
*see definition of height in the Zoning By-Law
**Unit Area is considered a minimum building area (footprint) on an individual lot
RURAL RESIDENTIAL (RR)
Permit Required
-
- Drainage Permit
-
- Demo Permit (if there is an existing structure),
-
- Water and Wastewater Connection Permit
-
- Electrical Permit (this is not a city permit, you must go to Manitoba Hydro)
Locates must be done prior to starting your project
Drawings Required
-
- Construction Drawings
-
- Floor Plan (if you’re pouring a basement but not finishing it, we still need a drawing showing where the windows are going to be located along with any bathrooms must be labelled)
-
- Cross Sections
-
- Window Schedule
-
- Foundation Plans
-
- Engineered Drawings (if applicable)
-
- Plumbing Schematics
-
- Red Seal ticket for Plumber
-
- Construction Drawings
-
- Engineered Drainage Plan (if applicable)
-
- Status of Title (issued by the Winnipeg Land Titles Office no later than 30 days before the date of application)
Site Requirements
Minimum Standards | |
Front Yard | 100 feet from property line (finished exterior) |
Rear Yard | 25 feet from property line (finished exterior) |
Interior Side Yard | 15 feet from property line (finished exterior) |
Corner Side Yard | 25 feet from property line (finished exterior) |
Height* | 20 feet |
Maximum Coverage | 10% of lot |
Unit Area** | 1000 square feet |
Building Separation | 8 feet from Principal Building |
Eaves: Side Yard | 1 foot from property line (finished exterior) (3.25.1.1) |
Eaves: Rear Yard | 1 foot from property line (finished exterior) (3.25.1.1) |
*see definition of height in the Zoning By-Law
**Unit Area is considered a minimum building area (footprint) on an individual lo